Translate

Showing posts with label Baby Quilts. Show all posts
Showing posts with label Baby Quilts. Show all posts

Saturday, October 6, 2012

Several finishes

The white board I purchased a week and a half ago is just the ticket needed IMHO! Since then I have accomplished 2 weeks worth of wishes (items written down)  completed in just a week's time.  Seems like it's the nudge I needed.  Who knew?  Of course Mom mentioned something about the fact that I may not have enough written in each day.   But I say, " Phooey",  as long as it's working and the promoter in this manner, it will stay as is!  lol

All four of those baby quilts are Done - Done!




Because  I wasn't overwhelmed or felt like I was is attributed to the fact that they were listed on that board.  Each section was listed in a manner like one day quilt a baby quilt #1, 2,3 or 4, then  the following day bind baby quilt #1,2,3 or 4, another day embroider 18" of thread onto another project I've had going for a bit then the following day quilt another baby quilt their number, etc.... breaking the tedium with other bits of projects that need the next step besides a small enough item that if I did get waylaid, (which seems to be a very common occurance around here) I had a chance of catching up in the next couple of days.   
Lil' man picked out this one for his nap time.

Whoop whoop!    I let PGS#3 select whichever one he liked and this is the one he preferred.  Excellent choice! 

Besides those four items there was another  finish that has been on my want to do someday list for a very long time.  The tutorial given by CJ  has been printed out since she first posted the directions, yes, it's been that long!    I've been trying to find her websight to link it and despite googling and trying different search engines for the past 20 minutes without success so I need to get to a football game this am.  I'll keep my eyes out for it and link it when I can reach it again.   Too many  other sights are infringing on her domain and I don't have time to filter through all those layers.   

It's a sewing machine cover that had a bit more to it than a cloth covering the machine with the piecing, piping,  quilting,  decorative stitches and trims added.  Of course since my Bernina 440 is very different dimensions than her Bernina 830 there were adaptions made with not too many areas of fudging needed due to the size differences and the machine embroidery being eliminated.  (I just couldn't drag out my enbroidery unit for the 170 to attempt this YET. )  As spoiled as I am, DH is even saying that my sewing room isn't large enough, but I am determined to make due.  I have enough.
So without further adieu ....


Check it out.

Cover for Bernina 44
Notice how it complements that pincushion/ort/tool bag from a week ago?

The top panel which was machine quilted.


The backside, oops sorry to show you a pic with my fleece dusting square in the underside of my sewing insert.
Seems like it gets so dusty in there! AND just over the top of the cover towards the left you can see where that white board lives in the room.

During it's construction, I used my Zipper foot #4 to place the piping on initially. Then when constructing the parts together, I used my #12 piping foot sewing just a hair's breath on the inside of my first stitching line.

Ahhh, Success! I do Love my Bernina feet!



What next's on the list you might ask......   here's a peak.


 
 
Namaste and joy be with you,
 
Jane






 

Saturday, December 31, 2011

Joining with Judy Laquidera's UFO challenge 2012

Judy Laquidera from Patchwork times blog has hosted this challenge for two years now, as far as I'm aware of. I did participate last year. Not as successful as many participants, but I still consider my involvement a success in being abole to totally complete 5 projects besides the other numbers were worked on and at least progressed on.
So it's with eager anticipation that I'm listing another 12 for this year. Now in the same paragraph, I'm also challenging myself to keep up with the UFO challenge that my mother's guild in Florida does. Naming 5 projects and with that challenge, you have 2 months to complete it. I'll list those at the end of this post without pictures since many are included in Judy's UFO challenge.


Number 1 - Husband's Bathrobe - Number drawn for February  2012.

Number 2 - Tow Mater Quilt - This one was  drawn for May 2012.

Number 3 - Scalloped Table Runner - This was July 2012 number that ws drawn.


Number 4 - Santa Redwork


*Number 5 - Inukshuk table quilt - Number drawn for January 2012
Finished this on January 31, 2012!  Glad I only used this technique for a small project.  For reverse applique, I  prefer the finished look doing it by hand rather than by machine as was taught in the class by Cathy Miller.   This quiltlet will remind me of our journey across Quebec and Ontario on our trip to the midwest.  Many Inukshuks were stacked along the highways and byways along the way.   Hummmm, reminds me I have an assortment of stone I brought back from Nova Scotia to make an Inukshuk to stand in the gardens or near the pond.  Perhaps I'll be getting to that soon.


* Number 6 - Cheryl's Chris' Quilt - Number drawn for ????? 
This was  finished and delivered this to Juanita on January 26, 2012.   Was able to make a bright green piping which I then added a solid  black binding.    It Looks really nice with that combo and it compliments the rest of the quilt beautifully.  When I delivered it, Juanita was in tears and thanking me for making this.  How  Bittersweet, glad I was able to, but missing her daugher , my friend Cheryl. 

Number 7 - Spring Patch-a-bilities this was drawn for August 2012 UFO challenge.


Number 8 - Disappearing Nine Patch with Moda's Kashmir IV line drawn for March 2012


Number 9 - Convergence
Sorry no photo......(I Need to find where I stored this one, esp if she pulls this number tomorrow!)

Number 10 - Grunge Quilt drawn for April 2012


Number 11 - 3 Baby Quilts to finish drawn for September 2012


Number 12 - Fall Country Flowers Patch-a-bilities - this was June's 2012 number drawn.



Two additional projects I'd like to get too are the Four Patch quilt and the Flora quilt.
Many of the above listed have been started and are languishing away waiting for me to get inspired or uh hum.... driven to finish them. Some are just kitted up and I want to get to, but yet won't allow myself to start until I get some more UFO's finished! A definite catch 22? and a vicious cycle? Or more likely my realistic "Janie Conundrums"!

*************************************************************************************

As for joining the challenge with Mom's guild that is starting on the 10th. You are to list 5 projects and number them. When the number is pulled (as Judy does) BUT herein lies the difference...........you have two months to get it completed. Here's how I divided them up for that:

1-     Tow- Mater Quilt

2-     Convergence Wallhanging
        Beach Tote finished 3 of these!  The last two while retreating in Fine, NY.

3-    - this was drawn for January through March 2012
        *Cheryl's Chris' Deer Quilt - Finished and delivered to Cheryl's Mom in Rouses Point, NY on 1/26/12
        *Inukshuk - Finished on 1/31/12 as a quiltlet to stand via an acrylic photo frame on a table top.
         Spring Patchabilities was drawn for August 2012.

4-     Disappearing 9 patch

5-     Santa Redwork 

As you can see most of these are also listed in the 2012 UFO list of 12 in Judy's challenge. I do hope the Number 5 is drawn first in Florida. All of these really don't have that much more to get done on. For the life of me I wonder why they end up in the UFO pile!

Happy New Year!

Jane