Translate

Showing posts with label Getting It Done. Show all posts
Showing posts with label Getting It Done. Show all posts

Monday, July 1, 2013

Setting my July goals

1- Non-negotiable, Get the borders on the camp quilt.

2- Non-negotiable, Stitch another block from the lil' Miss Shabby, this block is one I drew and created, so far am very happy with it....


3-Non-negotiable, finish iron caddy- FINISHED!
4-Non-negotiable, Cut sashings and cornerstones for the 10 minute block top - DONE!




5-Non-negotiable, Finish a Little Something Jacket
6-Non-negotiable, Quilt borders for the Convergence wall hanging



7-Non-negotiable, Kindle Bag, yep still on this list, one of these days I'll be surprising you and myself too probably!  This is my New for JULY! Hopefully by following Barb at Cat Patches with her New FO protocall and stating this project for this months' New FO that  will assist me in getting ROUND TUIT!  I can only hope!!! lol
8-Magic Eyes Storage Bag
9-Finish KumihimoBracelet - FINISHED! Plus made two more!!

All three of these quilty projects photographed are to be in my guild quilt show in October, so they must all proceed without any more delays.   

Jane





Thursday, June 6, 2013

Two done so far this Month and gardens..

It's seems really difficult for me to make up titles for these postings and sometimes seems like the simplest phrase works best.  But I'd be interested in how you would title this post.  Any and all ideas are welcome, just leave a comment with your suggestion or if you think this is good enough.

Anywhoo, I was able to get 2 items off my get it done for June list.   The first is the Tea Wallet. 



I used the free pattern available from Free Spirit called Break Buddy and only changed the placement of the upper folded piece to rest higher when the wallet is closed and am very happy with the results. 
That being said though, if I did make another one, I think two skinny  flaps sewn into the top edge to cover the opened pockets would be a huge plus since the tea bags I use do not come in their own foiled pouch. 




There are four pockets and about 8 of my regular tea bags fit nicely or 6  of my regular bags and these 3 ice tea mixers, NICE!  I've had this project on my horizon since I went to quilt camp back in April.  It was so easy and quick!   Note to self, this will make a great little gift so I should make several up and have them ready when someone needs a pick me up or I need a little personalized gift. 

Finally I re found the site where the pattern is, it can be found here it's no longer available at Free Spirit but at the designer's blog, http://100billionstars.com, Melissa Peda.





















The other finish is another Lil' Miss Shabby BOM that I started I'm not even sure when!   Perhaps it was February while I was still visiting my Mom in Florida perhaps.  This one is so longggggg overdue.   (Notice the whine!)  Now I only have 2   more blocks to go then I can start cutting into the fat quarters I've had in for this and do some assembling. 

I finally was up yesterday after another bout with a viral /sinus/ stress overload.  I went for help and the Doc placed me on antibiotics and this bug knocked me off my feet for 2 days.  I slept around the clock and slept most of the next day too.  It's good to be feeling better again.  So yesterday I actually had the energy to stroll around the yard taking some photos of the landscape before the predicted rains came. 

Glad I did.  Here's a gander:





 



Taken from the side.










 















Taken from the front of the house. 
See how they are cascading over the landscaping curbs.




Here's what those same bushes looked like on Sunday, 
just getting ready to show their colors.

 
 
 
Lucky for me I had the camera ready when our pool guys showed up. :)

DH and PGS#3 getting the pool ready for the season.

                    

This one is so easy on the eyes and what a worker.
PGS#3, age 4
Pool actually doesn't look too bad for surviving an Adirondack Winter. 
 

See what I mean, look at that concentration. 
 
In the back yard the snowball bush is looking the best it has since well for evah!  Every year those schaeffer beetles forage anything white and I think they think this bush is an all you can eat buffet planted just for them.

 
 

Nice to see it in it's glory this year and those deep fuchsia rhododendrons.  I hope all the forecasted rain doesn't damage them like they did the dark pink tree peonies. 

The little pink Rhodes that are in front and on the side of the house are gone and just the skeletal remains are evident, thanks to the last week of rain we had that beat them and all the blooms off the flowering crab tree out front.   

How they look now, versus how they were on the 18th of May.
 
 


 



 There are also some white Rhodes I planted on the path to the river, but they are nowhere near blooming yet.   I share more garden pics at another time.  It is looking so pleasant outside with all our efforts but there are several more areas that need some TLC whenever I find the time that is.



Now it's time to get this house back under control.  Anytime I am down, I swear this place just implodes without my care.  Now however does that happen?  lol   As if I wasn't aware.  At least when I am up, people are more conscientious of the messes and clutter. 




One last bit I'd like to share is about Martingale has a link which shares 52 tips and tutorials.   Help yourself to check it out and earmark it for your own convenience.  A lot of good information is freely shared.  

TTFN and Good Night,
Jane
 

Saturday, June 1, 2013

Get it DONE- May Report/June Goals

Looking back so I could link what I had planned on finishing for May and I now see that I never even posted it on my blog.  Now how did that happen?  Being spread way too thin, that's how!  After DH's procedure was over and he was better, I became sick for several days.  Seasonal allergies, stress, etc..so I took it easy and chilled.  My throat is raw and so sore still and the fluid in my ears so I've been popping Benadryl besides the Claritin D that's already prescribed and have been sleeping like  a baby.   Dh and I was able to put the portabel ACs in and that seems to be helping.  Anyway, thank goodness I note my Get It Done lists in my sewing journal calendar it helps keep me on track.    Anyways, here's the MAY list which was way too much for me to even contemplate working on  anything last month. 

May's List to Get It Done was:

1- Superman capes- 2 - DONE in April and were happily received by the youngest grandchildren.
2-Lil' Miss Shabby block- worked on it but still not done, will be moving this onto June's list.
3-Tea Wallet Caddy- Not Done
4-Iron Caddy- Started at a Retreat in April actually but still not done
5-Assemble the 10 minute block into a top, Not Done
6-For the Birds Challenge- DONE by the 13th
7-A Little Something Jacket- Butterfly print, cut out but no stitches yet.
8- Convergence Wall hanging- Still needs quilting, etc..
9-Kindle Bag/Organizer, Not Done
10- Straight Baby Quilt cut out- Not Done

So only 2 were achieved this past month, one totally finished and the other a start on the camper quilt. 

 June's  Getting It Done Challenge is:

1-Lil' Miss Shabby Block (carryover from May)  DONE
2-The Tammy Project Challenge- due on the 14th  DONE
3-Tea Wallet Caddy,  (carryover from May)  DONE
4-Iron Caddy,  (carryover from May)
5-Assemble the 10 minute block into a top, (carryover from May)
6-Magic Eyes Organizer Bag
7-A Little Something Jacket- Butterfly print, (carryover from May)
8- Convergence Wall hanging- (carryover from May)
9-Kindle Bag/Organizer, (carryover from May)
10- Straight Baby Quilt cut out- (carryover from April/May)
11-Also want to get the BORDERS on my Camper-For the Birds Quilt when I receive that dimple dot brown I ordered I can only hope it matches with what already has been used.

My first priorities are #1,#2 and #3 just to keep me sane and not so overwhelmed.  Hopefully this first week of June,  all of these will be done!!  Now if I can only knock out 3 projects a week, I'll be ahead of the game come July.
Now that DH is feeling somewhat better with the procedure done on the 23rd, I really believe I can find some time to sew.
 

Hear yea,

Hear yea....

FIFTEEN minutes a day is hereby enacted and planned for June. 

Can you hear the bells tolling while this announcement is read, I can.  (So formal like too, lol) 
Once I schedule 15 minutes to actually get into my sewing room, I tend to stay longer.  The time escapes me yet  so much seems to get accomplished that way.  
 
Anyways THAT'S my plan and I will be giving it my all.   Check out Judy Laquidera's blog to see other bloggers links. 
 
Stay cool,
Jane

Sunday, April 14, 2013

Stash Report #15 of 2013

Good to report that another 3 Yards were used this week with 3 pillowcases made for PGD#1.  What's that?  Yeah Me!  Two weeks in a row.  Maybe I'm on a new improved trend? 
Can I get a Hoot whoot?

The stash report for this week is: 
Stash In: 0 Yards
Stash Out: 3 Yards

YTD In: 47.75 Yards
YTD Used/Out the Door: 28.5 yards


That's a Net gain this year of 19.25 more yards into stash for this year (finally under 20 yard mark again, promise I'll be good for awhile and stop adding to my gains).
 
 
 
 
With those 3 pillowcases tallied into this week's stash report but were actually finished today. 
Sometimes there are just not enough hours in a week!   
 
Would you believe that bright striped fabric was setting in my stash and I thought it worked well enough with all the other colors in the Field of Flowers quilt that I finished at the beginning of the year.  It could be that perfect blend, but yet  something a little different so it wasn't all matchy matchy if you know what I mean. 
 
What do you think? 
 
Here's a closeup showing how intense those colors in the stripes.  They are a bit overwhelming if I used a bunch of it, but using just a hint of it in the areas I did, I like the looks just fine.
 
 
 
 
 
 
 
 
 
 
 
 
I made three pillowcases since PGD#1 has a trundle bed, thus  2 cases were absolutely needed and made one extra just in case. 
 
 
 
 
 
 
 
Here they are laying on top of that quilt,
just in case you forgot what it looked like.  : o )
 
 
Also, I am thrilled that the 10 minute blocks made out of those batiks are totally done! 
 
That makes 20 really big blocks that will each finish at 19".  Planning on using them in a grid of 4 blocks wide by 5 blocks high.  They will be shelved for the rest of this month so I can get to my other get 'er done items that were listed for April.   Hopefully in May I'll remember to list them to get the top sewn togehter. 
  I'm just loving this disected way of approaching my projects lately.   Talk about progress without the pain.  
Just like eating an elephant ........ One bite at a time!
 
The next focus for this week will be the pom pom project that I need to have finished
for the 29th for the Shake your Pom poms blog hop.   
What I was planning to make may have to change since in my excitement I showed lil' Miss PGD#1 what I intended and she doesn't think she'll like it. 
 
Stop the Presses! 
What!!! 
I think it'd be so stinkin' cute and she doesn't think she'll like it? 
How does a 7 year old have that much huxepah
to tell her Grandmother that she doesn't think that she'll like it? 
Humph! 
I think I'll be making it any way and we'll just see about that! 
Can ya tell I'm miffed just a tad. 
 
Well besides getting that pompom project going, the other 2  focuses for this next week will be to finish quilting that Convergence wallhanging and to cut out another A Little Something Jacket in between Dr's Appointments and other commitments already arranged.
 
TTFN,
Jane
 


 

Monday, April 1, 2013

Progress.


No kidding- The first item listed for April is finished!  Of course it was on my March list but was carried over this month.  I was able to hand stitch the facing this AM after getting the hemming done last night while watching Flight with Denzel Washington.   

There is no school this week, so the littlest grandchildren are here for several days.  I remember when my own children were young, I could sew and crank out a new wearing apparal in one night. 

I found this pattern not  too clear and specific for me while sewing it.  I had to reread the directions, scan ahead to see what they were talking about and rethink the directions continuously!  I even had some ripping out to do in one section.  Grrr!!!  Hopefully with the next one I have planned in a different colorway this month will be much smoother sailing. 




April's color for Rainbow Scrap Challenge (RSC13) is green - just the color I love!  I've been pondering which block to make still and perhaps I'll keep it easy and just make 4 HST of each color.   The other colors already assigned a month this year are purple, orange and pink.   Need to get off the fence and just DO IT!

 

Also Kristy from Quiet Play has shared a And Sew On paper piece block each month.  April's block called  "Not for paper" or even could be called "Snip It Real Good"  block #4 pattern has been released so now that makes me 3 blocks behind in that BOM.   My BOMs have slid off my radar and I hope to pick them back up soon. 

Here's what the expected pattern all assembled  will look like. 















Not sure yet  how this will be used, but I'm enjoying rekindling my love of paper piecing.  I have a couple of Eileen Sullivan's patterns all kitted that I'd like to get to and this is a perfect refresher with cute outcomes.  





Next focus project will be to finish the quilting on my wall hanging.   Here's a peak at the backing I'm using. Colorful isn't it. It actually has been in my stash for 30 years or very close to that.  Remember when the kids loved their jamms?  For those of you younger and didn't live through that time it was a loose longer boxer shorts made out of vibrant and out of this world prints, the wilder the better, you guessed it, one of mine loved the pair of shorts made from this print.  Can't believe I had enough for the backing and this bit is still what left.  I think I'll be making some simple community project blocks with a vanilla surround to usse it up. 
What til you see how I'm quilting it. Promise, will share more later.

TTFN,
Jane



 

March es past... now onto April Fools, 2013

Since it's the last day in March I'm summing up the list of four (plus extras)  that I listed at the beginning of the month.  Not great but not that bad either.

1-Stitch Me Up Project - DONE
2- Kindle Bag - Didn't even start, will be relisting this for April perhaps this is  a New FO whenever I start it.
3-Quilt Convergence Wall hanging - Started, the pieced center is quilted now that I figured out what it was calling for.  Have all the borders yet to quilt, then pipe, bind and label.  this too will be relisted in April.
4- A Little Something Jacket- Started and so close to being finished,  Hemming is all that is left.  This too will be relisted for April.
5- The Baby Quilt didn't even contemplate!

The apron and the 2 Superman capes that were finished  were on my list for May. Ah hummm... Can I say I'm ahead of schedule there!

Boy, can I ever fool myself!  Only one completely done out of the 5!  How foolhardy is that thinking that it wasn't so bad?  Progress was made on all but one and I did list five so I am content none the less.  Now onto my hopes for this month.

My four focuses  for April for the Getting It Done challenge are:

DONE  1: Finish the A little Something Jacket made from the tropical foliage rayon.
2: Kindle Bag designed and made.
3: Convergence wallhanging totally quilted.  Have a stalled and very cold engine for this baby.
4: Embroider another lil' Miss Shabby Block (that project has stalled since February but one more so close to being done).
5: Piping and binding for the Convergence.
DONE  6: Shake Your Pom Poms project, my date to share is the 29th.
It actually was one of the top two projects that day.
DONE  7: Batiks Quilt blocks made out of the 10 minute block pattern.  20 made.
8: Make another "A Little Something Jacket", perhaps the orange with the cream and black print. Reminds me of Butterflies.
9:  The "Straight grandbaby quilt", have the flowers appliqued onto center of the quilt, it'll be an original design but still a simple.
DONE  10: Pillow case(s)  made for PGD#1 to match her Field of Flowers quilt.  Perhaps this will be a nice sewing project to do with her this week since she's out of school.  Made 3.

NO, this list is not an April's Fools Joke, it really is my intention.  There are so many other items I could  and perhaps should have written but I'll limit myself to these.  If those others creep onto my sewing table and demand my attention well then, I'll be forced to comply and will add them at the end of April. 

What projects are on your horizon?  To see what many other bloggers are pledging, follow the link to Judy Laquidera's blog.

Sometimes I feel like such a slacker with many of my friends and my Mom, who is absolutely amazing shall I say. They all seem to get quilts done lickity split.  For example:  Like my  BFF Trudy, last week I stopped by to visit and enjoy a cup of tea and she had just started a baby quilt for an expected in May, great grandbaby, her first!  then BANG!   Saturday  she showed up at our little quilt group stitching the binding on.  Talk about gorgeous and quick!  She had even sent it out to be quilted!!!   Boy, I am not worthy.    Mom makes a quilt every month and gives it to Community service at her church and she doesn't make wimpy sized quilts either.  Those quilts are at least 50" x 68" and done with her scraps and yardage she's  pushing through.  Besides the other quilts and projects she completes each month is astonishing.  I really am not worthy.   Yet here I am, all smug in my feeble creative attempts and loving these little projects of mine.   

But my most important project is the time spent with my grandchildren.  Any  projects not completed are a small price to pay for the priviledge in holding them, playing a game, creating something and just  guiding their development that I am content.   It's such an honor and priviledge that I cherish  doing in this life and hopefully doing so with grace (my other intention).

Jane 

Friday, March 8, 2013

Backing made for lone star - CHECK!!!

Have to admit sometimes I am sneaky!    One of the focuses I listed in my pledge of four was to make the backing for my lone star quilt. 

 
CHECK!!

Hancocks of Paducah is having a sale on their wide backing fabrics so I just "uh hummmm... - MADE the backing" cough, cough,  sputter choke!  and am so plezzed with myself.  lol



This is what I ordered:   http://www.hancocks-paducah.com/Item--i-WP-7210-101 .
After placing the order, I noticed it's on back order so I wonder how long it will take.   

Initially for me this LONE STAR  quilt called to have more developed borders than it actually has. 

 
My dilema was that I ran out of fabric to do this. 

 
I needed more of that print on the left.  So after more than a decade and a half later, and after several failed attempts at acquiring the needed yardage, I literally  threw on  3 straight borders with the fabric I had on hand to get the size wanted.  Figuring it's a 15 year old WIP that needed to be finished.

When I got to this point, I wasn't happy.
 
This quilt was not what it needed to be.


So it languished  as a PIT (Project in Tote) and I stewed on and off for another year.  Last month I figured ENOUGH!!
I'll list it on the get er done list to get the back made and just proceed with it.

but , I still am not happy about it. 




It and I truly wanted it to become this:

 
 
 
See that second lighter border.   I drafted 60 degree diamonds into a 45 degree orientationand paper pieced the two corners successfully.  Here;s a leftover pattern since I only needed two. 
 
The seminole piecing  the 60 degree chains into strips for the two opposing corners have been done and  sitting very nicely in the Tote too.
 
I wish these could have been used in the 2nd border as planned.....

 
 


NO! I won't be ripping out any borders.
When I listed in the get er done for March I had initially figured on sending it to a longarmer and just get it quilted.
 
 
Playing with the quilt designs.....
 
 
 
Then while planning how this would be quilted I had an ah.. ha.... moment.
 
Perhaps I could quilt this originally concepted design into the borders and do a touch of trapunto for that pommegranite vine into the opposing corners. 
 
YES!!!!  That's it. 
 
With this being about 102" x 102" big, I know this will be a huge undertaking on my DSM. 
Though I am not a proficient quilter by any means, I have improved my quilting skills as I progress in this hobby.
Each quilt, bag, table runner and project made I see an improvement in the finished results.   I won't expect perfection in the quilting but will have fun as it proceeds.
 
The first step needed will be to design the trapunto vine design and stitch the batting to the backside of the topwith some wash away thread.  I can do this while I wait for that backing order and it will tell me if I am totally barking up the wrong tree with my little abilities. 

Wish me luck! 
 
 
Perhaps I should just start playing in the pillow I painted that will compliment the lone star quilt?  Here's a peak:                                                                                                                      
Click on the blurry picture of it and you can see the year, 1998 when this was stenciled and painted!  See 15 years at least!
 
 
 
Enjoy your day
I'm off to play,
Jane



 

Thursday, February 28, 2013

Getting it done - March's list

Since February was a short month and all but one of the four listed  items for Getting It Done Challenge were completed, I'm not going to beat myself up about the one that didn't!  My book club met tonight at 7pm and my grand daughter didn't leave until 6pm and then we had to fit supper in there too so the plans I had for tonight are being thrown under the bus!  I had thought of getting that backing done tonight after getting home, but I still am in too much pain with the back issues and I am tired.  So I'll start off March's list with that encore.

I also notice so many other bloggers get so much done and accomplished that I feel like such a major slacker!  So my intention is to pick up my pace this next month.  What you may be asking, do I have planned?

  1. Get the backing made for the Lone Star quilt and send it off to a Long arm quilter.
  2. Make the long awaited Kindle Bag/Cover that I've been wanting to do since forevah!  This will be a New FO for March.  I love it when a project can fill the bill in two different challenges!  Sneaky, I know.
  3. Stitch Me Up Project- A new blog hop coming in March.  This will be a New FO for this month too.  I really am enjoying these blog hops Madamme Samm thinks up.  This is a personal challenge of mine to perhaps participate in one each month.  It gives me a chance to grow and explore, stepping out of my comfort zone.
  4. Quilt the Convergence Wallhanging.
  5. Make the - A Little Something Jacket.  It seems silly to do that now when I am really focused on loosing weight, but I am tired of waiting til who knows when!  It'll get done.
  6. Hopefully if all of these are done then perhaps I can start a long over due Baby Quilt for a friend's grand daughter.  Wish me luck on this one.  It may have to wait to April though since it's already number 6 here.
Ambitious or NUTS?    Who knows, I just may surprise myself. 

With my most recent post, I was pleasantly surprised by how many blog friends stopped by and left such nice comments.  My head is beginning to swell with all of those kind words and praise over that quirky rendition of me, that I thank you all.  Another amazing note is how many people want to follow this little blog of mine!  To me it's a very public journal of the happenings in my life with highlights on vacations,  family and friends besides the hobbies or current interests from my perspective so I am humbled by the connectedness I'm feeling with such attention. 

Thank you all so much.  My heart is open and I feel so blessed to enjoy the many friendships gained  through this modality.    I can only hope I don't bore you to tears!  lol

Jane

It's All About Me - My version...

I'm sure you have seen this little lady all around Blogland recently.   She is totally getting around in all kinds of disguises!   It's an Amy Bradley design that she generously offered to many different bloggers participating with this hop hosted by Madamme Samm of Sew We Quilt! that's being led by our cheerleader Marlene from Stitchin By the Lake.

The design was easy to do and I personally love all the different ladies being shared with the different quirky personalities of her maker.

 My version   -    Voila!

Amy- I love the posture of this lady with her hands on her hips.  If I didn't know any better I'd be thinking you've been watching me to design this one.  lol


It turned out cute if I do say so myself.  I deliberated just what to make for several weeks until the project  finalized in my mind.


So I minimized the pattern to fit onto my new food journal. 

Googling how to make a book cover and then fine tuning that process for a "more finished one".    I changed the directions on how to make the flaps so all of the edges were finished.  I also inserted many ribbons for markers. 
Having Diabetes II, this will be an easier way for me to really see how my diet, exercise and sugar levels are and what I might have  done the day(s) before and the day of any incidence of elevated numbers.

I actually used a makeup sponge under the shirt to poof out the belly just a tad. lol

Just looking at my smurky self in ALL of my abundance, even the bust line trying to fight gravity, (a no-win situatiton)  just makes me smile.   8')

Wanting an organic feel to this design, I choose to hand stitch the pink appliqued rectangle onto the book's background fabric using a DMC 8  heavy weight thread.  While proceeding on this project I assembled it so many times in my mind several times to figure out how to get the finished edge on the bottom of the appliqued part while  still allowing my figure to "Break out of the Box"  with my elbows sticking out over those pink borders.  It was a bit Tricky- but was  easy enough to do after giving it much thought and getting the correct order realized.    I'm Happy with that success too!  The only part I should have done was use a stronger stabilizer for thread painting my hair.  It did pull that fabric just a tad.

Since I'm always wearing earrings and love anything that sparkles and shines, a little  BLING BLING* crystals were added that would go with the  shirt.   For many decades I've told DH that if it sparkles or shines, you can't go wrong.  That Christmas he gave me a chrome toaster, of course that's Not quite what I had in mind!
 
The only flesh toned fabric I had was used showing the toned down back side.  Looks okay even though I don't have any freckles. 
 
 The  hair actually started as 3 pieces of a yellow/brown cloth so it would flow behind the ears and still cover over them appropriately, but I had too much fun thread painting my streaks onto it.  I think I got carried away since you can hardly see any of it.

I also wanted the shirt to have a creased look at the bust line so I cut it apart and stitched it like that.   Notice I was super careful on where those dots ended up?  Being a seamstress and making my own clothes for many years I didn't want any provocatively placed dots! lol

Aging as I am, reading glasses are a must and sunglasses for that matter too.  Typically I am wearing them on the front of my shirt or blouse when they are not on my face, so I auditioned that look on the pattern as shown to the right. 

First, I drew in a plain frame but that looked dorky.    So then I colored it in to change them to sunglasses and that seemed to take away from the cute quirkiness already in place.  Since I didn't want that to happen  I chose to eliminate them all together.    Sometimes when you're creating, it's good to know when to say when! If you know what I mean  {a little laugh now}.    To add my glasses and a pen holder to this journal, I added a touch of webbing to do this.  These loops make it convenient and make those items super handy whenever needed.  8~)

I also choose to put my  words on the inside title page of this journal instead of the on the cover. 

                AND SO IT BEGINS......



It's a happy reminder of this fun hop for me to use everyday.  It makes me smile everytime I go to log into it.   Perhaps I'll be drawing a skinnier version of me on the back cover as I wanted too but my drawing abilities have there limits ya know.


Happy too that this New FO is finished which is a challenge I participate with lead by Barb of Cat Patches.  This project also completes one of the items of the list of four I mentioned to getting it  done challenge in February.  Another challenge I participate with that Judy Laquidera of Patchwork times leads and has links for.



Thanks for visiting my blog and if you have time, please use the links below  and have fun checking out other bloggers participating in this Hop.    Of course a nice comment always makes my day too if you feel so inclined.  Here's the list of bloggers for the final day of the "It's All About Me" Blog Hop.


Cherry Blossoms
Hill Valley Quilter
Dachsies With Moxie
I Like To QuiltBlog
Quilt Smiles
More Stars In Comanche
Tea Time Creations
Shedding the Wolf
Life, Quilts, and a Cat Too
Judy at That Other Blog
Madame Samm

My appreciation goes to Amy Bradley, Madamme Samm, Marlene and Timeless Treasure for all you gave and did towards this hop.

It was fun to do and I am really  glad to have participated with it!

TTFN,
Jane


 

Sunday, February 17, 2013

Stash Report 7 of 2013

Judy Laquidera of Patchwork times is our fearless leader in looking at our stashes in this manner.  Thanks Judy, it adds a whole new perspective to my craft of quilting and keeps it real. 

Stash In: 0 Yards

Stash Out: 1.5 Yards

YTD In: 17.5 Yards

YTD Used/Out the Door: 17.0 yards
 
I'm able to count one and a half yards used up this past week with several little finishes!  That means my numbers are ever so close that they may actually flip to the dark side by next week.  Yahoo!   Even better yet is that the runner was in my Get R Done challenge for February! 
 
The celtic table runner is totally finished.  You've seen it probably a thousand times already, but I just have to show another picture of it but this time in a different layout and light.   Sorry, still no glamour shots of it.
 
 
As you can see I quilted a generic stipple in the green field area, leaving the pinwheels be, so they'd expand away from the surface.  I did start quilting around the phrase on each end section, but it detracted from the look I wanted so a lot of ripping out had to happen so I could bind it.
 
 
Wonder clips are just beautiful to work with.  Didn't seem to have a thread tangle going on with these like I did with the hair clips I used to use. 
I highly endorse them!
 
All done now and it's just what I want, perfect!


 
 
Also I was able to finish up the four makeovered pot holders yesterday.  Here they are.
I quilted around each motif through the top and the well worn terry cloth scrotched older parts I recycled.  After using a black heavy duck cloth for the back (binding too) I machine quilted those parts together using the lines of the different colored squares surrounding the peppers.  Then attached the binding by sewing it to the back, turning it over the edge and then topstitching the binding with my hem stitch foot #10 close to the edge.  Remember how nasty they looked before.  BIG DIFFERENCE!
This could also be a New FO for the February's challenge cheerleaded by Barb.
 
I have one or perhaps two more pot holders that I'd like to make today before those fabrics  all get put away.  I used to hate putting my fabric away after a project.  That's why I always sewed in a room that looked like it was hit by a twister.  Now, I love putting them away in an orderly fashion.  Letting them sit there politely on the shelves just waiting patiently for me to play with them another day.   I think the reason they behave so well now is perhaps because I've sent some of their family to CHARM SCHOOL and they've witnessed this. Mwahhh, haha! (Inserting evil laugh here.)  But let me tell you, if any of them are unmangeable, off to charm school they will go!
 
All in all, only a net gain of 1/2 a yard YTD.  "Not bad" if I do say so myself.

Thursday, January 31, 2013

Get It Done....

All of the Get It Done tasks I listed to get done in January got Done!

Whoo Hooot!  

How I reported then done was to re-open the initial post and update the information there.  Here's the link where  all of that is listed.   Being so successful in January, Here's my list of Four for February.

  1. Quilt and Bind The Irish Table Runner from the In Your Own Words Blog Hop. Finished on the 16th.
  2. Make the  "All About Me"  project that I'm participating with.  It's another blog hop coming soon, an idea is fermenting now....This will be my NewFO for February.  Finished on the 26th, JUST UNDER THE DEADLINE.  It took me the longest time to really figure out how I wanted to use that cute pattern given by Amy Bradley.  Just love it now that's it's done and I'll see it daily. 
  3. Piece the backing for the Lone Star Quilt that's been a languishing UFO for several  years, I need to get this to a long armer.  I was thinking of trying to quilt it on my DSM but it's a rather large quilt and I have other projects I could work on while it's getting quilted. Hopefully I can get it done tomoorow, the 28th!
  4. Get another Lil' Miss Shabby Quilt block embroidered, besides keep up on the And Sew ON BOM, and my quilt guild's BOM offerings.  I don't want to fall behind, it's so much easier and fun to do when I keep up. Done, reported and shown on 2/6/13 
I know I'll progress , but how much?  Time will tell.

Jane